The Eurovision was a great success for Turin, the show took place inside the Pala Alpitour where all the main electric backbones are made with GDA busbar ducts, reliable in all conditions of use.
The Eurovision was a great success for Turin, the show took place inside the Pala Alpitour where all the main electric backbones are made with GDA busbar ducts, reliable in all conditions of use.
When it comes to power busbar trunking, a standard out of the box system is not always appropriate.
Graziadio UK can assist with providing bespoke systems, without the bespoke lead times.
We have supplied our busbar trunking for the project at Polo Davinci-1, Genova. It is a new Datacenter made by the Italian company Leonardo and it is among the top 100 in the world for power and performance.
Our supplied products are
* GDA 160A & GDA 250A thanks to which we offer a simple plug and play solution for power distribution. Power cables can be quickly installed with a large variety of tap off boxes, switches, plugs and meters.
* Isolsbarra 630A & 1600A busbars in aluminium and IP66
The flexible distribution of energy provided by Graziadio’s products is suitable for moving and changing load distribution frequently, very quickly and without cost.
With the backing of the Ministry of Education and the Ministry of Health in Christchurch, two new commercial office buildings will be part completed in February 2017.
However, with 80% of the office space already being rented, it is obvious that our easier, quicker and cheaper GDA Power Busbar will be serving a building in high demand.
As part of a £17 million renovation, this famous building in Abidjan utilised both 630 A and 800 A GDA Power Busbar as a means of easier, quicker and cheaper installation.
The building is 26 storeys, over 100 metres tall and ranked 69 in the list of ‘Tallest buildings in Africa’
GDA Power busbar provides a clean and simple installation, with tap offs to the various machines in factory. Taps can be added easily as production increase. Busbar is so useful to industrial settings like factories because of how easily and quickly it can be installed – causing little disruption to manufacturing and productivity. Time is money!
Picture Credit: Fanuc Robotics
With a total of 250M to cover, GDA was installed in typical 4M lengths but with simple plug in access on each side, the installation was much quicker than if traditional trunking methods had been used.
In the Local Government building of Puglia in South Italy, GDA and Isolsbarra busbar is mounted on panels for electric distribution, which supplies the entire building.