2000A GDA Power Busbar Yorkshire

We were proud to supply a 2000A busbar system for a
Yorkshire based producer of rPET bottles and containers
in their battle to reduce the use of single use plastics. 

From the initial understanding of requirements, a system was designed, approved, produced and delivered in just 6 weeks. 


Tap off outlets at the front of the busbar mean that a standard elbow would result in the outlets being facing up or down. 

This was not feasible considering the size and type of tap off boxes being installed. 

So double elbows were designed and produced ensuring tap off points positioned in the most accessible place. All in the same lead as the standard items on the rest of the project. 
With 3 sepereate lines required, each with varying off-sets, a pre-production schematic was created to ensure everythingwas  positioned correctly in line with customer expectations and requirements.